Tony, that leaves me out nine-tenths of the time!
Here's what we are doing now-
Dale is starting the porting.
Kevin is starting the heads
Don is working on the rear main seal housing.
Chris is doing CAD work for this engine, and the next one.
Pete is working up a new cam/lifters design.
Randy is getting the clutch linkage finished, and is almost done with the floors.
John is working on aero with his fiberglass, and also air induction.
Mike is pounding metal and slinging mud, getting ready for paint.
I'm working on the chiller box, and the engine cooling box. Can I use a thermostat, without a radiator, and just pressure up the cooling box? I can't see where 15 lbs pressure should be that big of deal.
Lots going on, and I should have pics to post next week.