There was a delay on the delivery of my front spindles.
I was told they'd be here tomorrow for me to OK the machining.
The secretary from Arma Gear called and her description of the
small issue was sketchy at best so I'll wait to see what they
manufactured. Arma is busy on a bunch of stuff so I'm not
too uptight. The parts will arrive when ready.
All these LSR projects drain the piggy bank I suppose and right
now I'm fortunate enough to have enough work to keep me busy
until I throw in the towel. Ashley who lives around the corner has
given me so much work I think my days of eking out a living are
over. He started out wanting another gate for his house and due to
space being at a premium I decided to get the thing done ASAP.
I started Friday morning welding up the rail for the runners.
Saturday I cut the material for the gate and by 14h00 I had the frame
done. Sunday I worked from 11h00 until 15h00 putting in all the bars.
The quality is very good IMO and it all left this morning. Sorry I don't have pics
of the liner construction but as soon as I get my parts I'll post.
I've never built a gate in so little time but the liner is a hungry beast and I need
to buy stuff.