Our new rod/piston combo.

First piston being installed.

This shows the curved grooves on the bottom of the rod. All of our other rods had a straight cut, on a curve there is more surface area for strength.

All of the slugs are in, now it's rime to torque em down.

This shows that BME suggested that when torqueing the rods that a feeler gauge be put between the two rods while tightening.

Cam and ballancer is on.

This picture shows the direct of how the ballancer installer should be, flat when installing.

And curved when taking off, there are more bolts that go through this pulley system when disassembling ballancer.

Getting ready to time the cam. We got the wheel and the lifter gauge so we know when the intake is opening.


We will get the timing done on another day. Still plenty to do before we get our heads back from Phoenix.
