Well, still waiting on my trans adapter.
I understand it's a semi custom made peice, but 7 weeks is an awful long time. At least it is when a guy is working against a five month deadline!
Been doing as much as I can at this time. Thought about putting the roof back on, but, the extra room sure will be nice when it comes time to build the floor and tranny tunnel. Been adding some gussets to the frame and the cage, doing a little bit of tinkering. Good news is the cylinder head is at the machine shop getting the ole once over. I came across another head and the price was right so I can use it for mock up while the "good" head is being worked on. Wish me luck, gonna head back out to the shop and get a bit more done before I need to head home. Hopefully this darn adapter will show up before the weekend!
And tauruck, there is some pictures of my wheels and tires earlier on in this project. I'd take some pics of them on the car but there is too much crap around the car right now. Gotta love trying to build something in the middle of a busy repair shop!