Productive night tonight!
Randy and Chris worked on wiring by eliminating all unused wires in the FAST xfi harnesses and wired up the egt gauge.
Ted and Jon worked on the molds for the air inlet ducts and got them to about the 50% mark.
Ray and Matt worked on exact placement of waste gates and started cutting and fitting the 2" stainless tubing.
Dave welded up the stinger and it looks great as always when Dave welds on it.
I cooked the dinner (pulled pork sandwiches and veggie tray) then ran around the shop like a chicken with head cut off. LOL!
Tomorrow, actually this morning, I will head up and visit Buddy on his rig. Better quit typing and get a couple hours sleep.