Well Andy and I had a 21/2 hours last night we got the cooling water tank remounted, and all of the new stainless tubing cut to length and almost installed.
I have repurposed what was going to be the intercooler pump to one that we can off pump hot water into several 5 gal. jugs so that we will be able to change the cooling water and hot lap if we get an opportunity as Bill Jr. and Marty lisc. up. I should be able to post picts. of the new wheels and tires if all goes well today.