Haven't been around much lately. I'm on Wi-Fi here and they can't seem to get their act together.
Crunch time is officially here with less than 2 months until Speedweek. Looking back I can't believe I was so naïve as to think I'd be dyno testing by April back when I started this last September.
. I've got the week off and it's the last I'll have before leaving so the big stuff has to get done this week.
Got the intake tract all done today. That's a big step because the engine can't be positioned until the carb is positioned. (The Lectron carb is darn near as big as the motor!) Tomorrow we should be able to get the engine mounted and the expansion chamber turned 180 degrees so it exits out the front. Hopefully, the body will get mounted Thursday and then it should all be downhill. (remember the part about thinking I'd be dyno testing by April?
)
Found out there's an SCTA tech inspector not far from me who can do a "tech for class" inspection of the bike. That would sure be a load off my mind.