Keep the primary pipe length close to what they are if you can Gogg's, it's bound to be right for that eng.
Sid.
Here's my plan, they have to tuck tighter to the block than they currently are, that means taking something out of them before they turn downward. I figure the smartest thing to do would be to work out which has the least we can take and chop that length out of all of them then add a piece in the vertical section of the same length.
Obviously there'll be some license there because the main job is to make 'em fit. We will then lop the end off the collector back to the taper and take them to our tail pipe. Had to get the starter motor first because that's a pinch point... I got a reduction starter with a nice small motor but still rated for up to 18:1 a standard one wouldn't turn that motor.
Hey Colonel, I bought you some mig wire too, well I bought it for me, forgetting my machine only takes 5kg rolls.