Well, it’s starting to look like an engine. Crank is in, oil pump, timing gear and chain (adjustable next year). Shims came in for the rocker shaft – I’ll hit that tomorrow – seems I’ve taken the valve train apart and put it back together so often I can do it in my sleep. Flywheel has been on order since mid-April.

I’ll need to take it back out to the garage to finish it. I’ve been doing the assembly in the abandoned control room of my basement recording studio, and thus the curtains and sound insulation. Quiet, air conditioned comfort, very clean and dust-free, unlike my garage. And now that I’m looking at the pictures, I realize I need to bend over the lock tab on the crank pulley. Tomorrow.

It's come quite a ways from this seized up old boat anchor -

And Kate made cake! Coconut-lemon. I’ve been a good boy, so I’m going to have a slice.
