Those of you that read Max's plans for 08 on his website know he needs a different lift, his old on is 3 feet wide and has clearance issues with the hack. To solve this issue, Max is planning a new lift, and hopefully it will also aid in loading and unloading the liner from the new trailer.
After discussing what he planned, we made a little trip to the caster store (Harbor Freight) and a place here in Wichita called The Yard. If you can't find it at The Yard, you don't need it.... find being the operative term here.

You have to locate it before you can buy it.
The basic layout, it is 5 X 7, with 5 foot legs, 2 inch 11 gauge tubing
It was leveled on the floor, then the legs were welded plumb
The armadillo has landed... bracing is in production, not welded yet, also have to figure out how to cut a 60 degree angle for the scooter side fore/aft brace. The scooter will hang on the angle piece 18 inches from the side.
Back to work....