Last saturday night I decided I needed some workshop time with a couple of beers after the family had gone to bed, so I headed out to the shed and continued working on the fuel tank.
A welder needs quality music!
The tank is cooling off after welding, the Argon bottle is almost empty so I need to get it filled before the next workshop pass.
The tank lid in place and lids placed on the fuel return and breather connections.
One of the rear tank mounts in place.
The other of the two rear mounts, sturdy enough I believe.
While waiting for the tank to cool down I made the last three braided fuel hoses for the bike.
Here the tank is in place, it was almost 3 in the morning so making the front mounts had to wait for some other day.
A snake nest of hoses everywhere on the bike, I will have to figure out some fancy aluminum clamps later to arramge them a bit.
Cheers!
/Anders