With the jet kick racing done for the year it is about time to get the bike sorted out for the summer racing, so far I have made good progress but I really want to get it ready for a test run as soon as possible so I know that everything is ok.

I made the last brackets for the side fairings and asked my feancee to take a couple of photos with me on the bike so I could see how the fairings follow the leg angle.

The rules for the APS bike class says that the legs must be fully visible from the sides, plus I don´t want my legs to get caught on the fairings when lifting them from the ground to the foot pegs when starting a run.

I could see that there was a bit of trimming to do, aluminum is as you can see much easier to work with than stainless.


Now it looks much better, no problems moving my feet off and onto the footpegs any more.

When I sat on the bike I noticed that my right knee hits the connections for the air and propane hoses, so I decided to move them and at the same time mount them much sturdier than before.
On a side note I can really recommend Migatronic tig welders, they are a real pleasure to weld with compared to the machines I have used before.

The fittings are in place, now they are both out of the way and fitted rock solid.

Cheers!
/Anders