More work on the flame tube. First out was to roll and weld the transition cone between the outer liner and the NGV wall.
Since all of you know the difference between the primary and teritary zone hole diameters you can tell from the picture that I f*cked this one up, I welded the cone to the wrong end of the liner!


Oh well, cut it away with the angle grinder and weld it to the other side. Here I´ve just spot welded the cone and the short strip that will be drilled for the securing screws later.

Success, it was possible to remove it afterwards!


Time to start with the inner liner, after cutting out the sheet metal I did the hole marking in the livingroom sofa with a cup of tea. Much cosier than sitting in 10°C among the workshop chaos.


Drill drill!

After rolling and welding the inner liner it looked like this.

Evaporators test fitted.

And finally a pic with the outer liner in place, all that is missing now is the front wall.

Cheers!
/Anders