We finished up a few things last night, after a late start.
We completed all of the water lines going into the blower pipe.
Here is a picture of our blower pipe installed with the feed line coming up from the bottom.
The engine compartment is now complete.
Today we need to pack the chute, fill all water tanks, load the car into the trailer and take it down to Precision Auto and dyno tuning. At the shop we will wire all of the water injection, phase in our fast unit, secure the car on the dyno and if everything goes perfect maybe even start it.
We are still behind where we want to be, but hopefully we will be done on the dyno early on Wednesday to get loaded completely by early Thursday. We need a little luck so we don't have to thrash so hard.