Hi, been a while since I posted.
Spent a week servicing ute, sorting camping gear etc to go to Lake Gairdner then packing it all away again when it was cancelled.
Chucked some camping gear on my Guzzi and went for a bit of a ride in central Queensland going nowhere in particular, around 1500 miles, the guy I was going to ride to the lake with and his mate came as well, was a good break.
New pilot chutes, harness and arm restraints turned up in the mail while i was away, minor hickup with the harness but its getting sorted so all good.
Got back onto my build yesterday, started machining up the front axle mount;
The small blocks weld onto the front suspension yoke, the lower control arms rose joint onto the bigger blocks. Pretty steady going on little mill/drill, the big blocks will go on a diet after it's all together and I get a good visual on the load paths.
Will put a couple sheets of paper between the mating faces of the big/little blocks before boring them so that they clamp the axle tight.
Cheers
jon