I haven't got around to the welding yet.
Other stuff got in the way.
Been doing some shopping.
Bought 6ft of fuel rail for a whopping $20.
I also took my 7 outer rims to Joe to have the centres
welded in and he was closing up shop!!!!. After the
initial shock he explained he was moving to the big
factory and not closing down. What a relief. I guess
I can wait a month for him to settle in.
Waiting on a pile of nuts and bolts, front spindles, wiring,
hose clamps and other bits and bobs. I love my sponsors
but they sure take their time.