Dave,
Thanks for the info and the pictures. I learned a lot helping in the tunnel in May.
My new 1953 Studebaker build is within 10 days of being complete.
That will not leave me any time to get it to the tunnel before I go to Maine (leaving on the 28th)
I had hoped to get a 2 hour baseline test in A2 before we go to Maine,, but looks like we have run out of time.
As soon as time permits I will get with you,,
Thanks again
Charles