Well I rolled it around on the floor today, a little welding, a little grinding, a little fabricating --- I have finally started bracket racing----
I decided to work in the fuel bay. I drilled my first hole in the new bulkhead to be able to run the trans shifter cable and I mounted front plate on the lower middle tube to mount the radiator in a box,, on, and on little stuff.
I will be ordering new throttle cable and parachute cables as well as some misc cable parts.