Still no PC and ADSL connection.
Landline still out as well.
Fighting on though and thanks to my mate Ian I can connect from his place.
Here are the pics of the new plenum project.
The box will be Carbon but I've started fabricating the runners, runner mounts and other bits.
No milling machine but we make a plan.
I found 8mm Ally leftovers and cut them to size. I punched and drilled the 4 mounting holes using
marking blue as a guide.
A cross through the center and I got to work on punching out the opening for the plenum end of the runner.
This is round but needed to be angled. Drill press and hole saw.