Well it has been awhile since I last posted on this build...........things have changed quite a bit for me........I went back to school full time to get a degree in business. Needless to say my time with bike is and will be limited. I have been thinning the heard and only have a few bikes left and they will be sold as well, I am going to keep the busa as my one and only bike.
I had big plans for this bike and still do, however they are going to take much longer with school, work, a wonderful 8 month old baby girl and my lovely wife. They all need lots of attention so the bike comes last.
Today I did have a few hours to work on the busa. It was great to be back in the garage turning wrenchs!!
I took the gas tank and air box off so I could get to the plugs and injectors.
I removed the injectors, I am giving them to my friend Kent who is going to send them off to his friend to check them out. It is possible one of them is clogged or blocked as the bike has been running weird.
Took off the radiator and oil cooler as well so I could install my new Yoshimura SS header.
Old header is removed and I am giving it to my friend Kent for all of the help he has and continues to give me.....
Here is what the bike looked like after a few hours
Kent is making me a pan for the seat so I can get my big ass out of the wind and I am going to fill the void in front of the seat with a hand built gas tank.
I have been buying parts to run no2 as well. So far, I have most of the lines, solenoids, bottle, purge systems, fuel pump, and a regulator. I am in the hunt for PCIII or equivelant and a no2 controller. I plan on running stock for a while and maybe by the end of the year I will be able to spray the bike.
Scott