Jack,
No, it's all home fab. Now usually 3 stages.
1. Conceptualize
2. Next day figure out the dimensions and materials needed
3. The next day figure out a different and simplier approach and start cutting metal (after a paper or cardboard pattern).
Finished cutting, welding, grinding, painting and installing today. Worked out great. Now some final adjustments to the linkage to verify full throttle opening and a throttle stop. As JD suggested in a PM, photos of everything for the Log Book to show the Inspectors all of the details.
Tom