Author Topic: Getting ready for Bonneville(rebuild)  (Read 1892892 times)

0 Members and 2 Guests are viewing this topic.

Offline Dynoroom

  • Global Moderator
  • Hero Member
  • ***
  • Posts: 2189
Re: Getting ready for Bonneville(rebuild)
« Reply #2160 on: September 07, 2015, 08:40:00 PM »
John, if you haven't heard the Oct. El Mirage meet may become a two day event, along with the normal Nov. two day meet...   :cheers:
Michael LeFevers
Kugel and LeFevers Pontiac Firebird

Without Data You're Just Another Guy With An Opinion!

Racing is just a series of "Problem Solving" events that allow you to spend money & make noise...

Offline jl222

  • Hero Member
  • *****
  • Posts: 2955
Re: Getting ready for Bonneville(rebuild)
« Reply #2161 on: September 08, 2015, 12:49:08 PM »
John, if you haven't heard the Oct. El Mirage meet may become a two day event, along with the normal Nov. two day meet...   :cheers:

  Yeah, hope so. I guess the biggest problem is getting enough workers from the clubs.

  It's a 500 mile round trip to El mirage not counting to Victorville, so a 2 day event gives a lot more bang for the buck.

                JL222 :cheers:


Offline jl222

  • Hero Member
  • *****
  • Posts: 2955
Re: Getting ready for Bonneville(rebuild)
« Reply #2162 on: September 17, 2015, 07:36:19 PM »

  Owens couldn't make it up hear until tomorrow so I had to make the 11/2 hr drive to Springville for trans Friday.

  installed trans and changed shocks back to originals. Rear shock change a major pain in the axs.
  Tried to install new pulley on blower and discovered bolt holes were bigger than old pulley. DANG!!
  We wanted to get on dyno before El Mirage next Sunday but some crew members are under the weather and we still need to
make a new dust shield under the bell housing and frame.
  So were going to wait on El Mirage and hope El Nino doesn't rain us out.

               JL222

  New blower hub with bigger bolt holes ordered as they no longer make the pulley with smaller holes.

  Sunday, we'll make the dust shield and install trans ballistic blankets and the cover.

  Heat up hub, to take it off to be ready for new one. Hey they said I didn't need a puller.

 Then Bar-b-q tri-tips for Troy's birthay :-D

             JL222

Offline jl222

  • Hero Member
  • *****
  • Posts: 2955
Re: Getting ready for Bonneville(rebuild)
« Reply #2163 on: September 25, 2015, 01:25:03 PM »

  ProCharger hub arrived, along with bolts for pulley and hub, new keyways and hub washer. Wasn't sure about bolts Ect. :-D

  Finished up dust shield and buttoned up trans. Installing blower hub, new pulley and fire up Sunday.

             JL222

Offline Glen

  • Global Moderator
  • Hero Member
  • ***
  • Posts: 7024
  • SCTA/BNI timer 1983 to 2004, Retired,. Crew on Tur
Re: Getting ready for Bonneville(rebuild)
« Reply #2164 on: September 25, 2015, 02:37:14 PM »
JL222 the fun never ends. BTW How is Arly's liner coming along?
Glen
Crew on Turbinator II

South West, Utah

Offline jl222

  • Hero Member
  • *****
  • Posts: 2955
Re: Getting ready for Bonneville(rebuild)
« Reply #2165 on: September 25, 2015, 04:03:13 PM »
JL222 the fun never ends. BTW How is Arly's liner coming along?


  Arley's liner has been in the body shop for at least 2 yrs  :-o It always amazes me how these guys have no conscience about getting the job done,

 Mostly fuel lines Ect if he ever gets it back.

               JL222

Offline bvillercr

  • Hero Member
  • *****
  • Posts: 2291
Re: Getting ready for Bonneville(rebuild)
« Reply #2166 on: October 04, 2015, 09:02:23 PM »
Did some cosmetic repairs today and tomorrow we will warm it up adjust the valve and take it to the dyno for some El Mirage tuning :-D


Offline Captthundarr

  • Hero Member
  • *****
  • Posts: 1475
  • In line
Re: Getting ready for Bonneville(rebuild)
« Reply #2167 on: October 05, 2015, 08:35:18 PM »
Oh yeah :cheers:
Live,Laugh, Love /  Jack Scratch Racing /ECTA   
Amy Hartman-Driver, Frank Hartman-everthing else.
C/GALT 137.65 Ohio Mile check that 144.12 2013, AA/GALT 159.34 Ohio Mile 2014. B/GALT 180.577 RECORD 6/15

Offline jl222

  • Hero Member
  • *****
  • Posts: 2955
Re: Getting ready for Bonneville(rebuild)
« Reply #2168 on: October 06, 2015, 01:34:07 PM »
Did some cosmetic repairs today and tomorrow we will warm it up adjust the valve and take it to the dyno for some El Mirage tuning :-D



  The world is getting more flakes in it every day. Stopped and got $38 of ice for the intercooler, towed 30 miles to dyno and nobody there. The guy knew we were coming at 3:00 and was there at 1:00. After waiting for a 1/2 hr we called his partner.
 Partner says he's helping grandparents move, dropping off last load and returning U-Haul. Be there in about an hr.
 After 31/2 hrs we called and said we had, had it.
 
 Contacting another dyno shop today.

                 JL222
 
« Last Edit: October 06, 2015, 01:39:40 PM by jl222 »

Offline Captthundarr

  • Hero Member
  • *****
  • Posts: 1475
  • In line
Re: Getting ready for Bonneville(rebuild)
« Reply #2169 on: October 06, 2015, 07:21:56 PM »
Must be nice for the dyno guy to make so much money to pass up a customer, SMH.
Live,Laugh, Love /  Jack Scratch Racing /ECTA   
Amy Hartman-Driver, Frank Hartman-everthing else.
C/GALT 137.65 Ohio Mile check that 144.12 2013, AA/GALT 159.34 Ohio Mile 2014. B/GALT 180.577 RECORD 6/15

Offline DND

  • Sr. Member
  • ****
  • Posts: 395
Re: Getting ready for Bonneville(rebuild)
« Reply #2170 on: October 07, 2015, 07:54:24 PM »
Its a tough GIg anymore finding a decent shop for anything no matter what you need done , as the whole country has come down with ' Flake Fever '

Hope you find a good dyno shop

Offline jl222

  • Hero Member
  • *****
  • Posts: 2955
Re: Getting ready for Bonneville(rebuild)
« Reply #2171 on: November 16, 2015, 03:19:56 PM »
  WOW...400,000 hits!!  As usual if its one problem there's another to go with it. We did go to another dyno shop but engine was acting up [just not sounding right] so we went back to the shop. Two valve adjusters had come loose [ thought I had tighten them good but must not have] bent a pushrod and damaged an adjuster. Replaced them, started engine at night in shop, which was a first, roll up doors opened though, blue flames 3 ft long out of headers except for # 2 which was not firing. Problem traced
to short in wiring connection in EFI, no electric signal no fuel.
 The injector wire harness  from both sides of engine connect to main harness with a short Y harness. We tested for continuity on each wire and checked for shorting in all the other connections at same time. All tested good until connecting the Y. then shorts across connector plugs showed up.
 Will probably end up sending harnesses to F.A.S.T EFI.

              JL222

 

 
« Last Edit: November 17, 2015, 01:46:33 AM by jl222 »

Offline jl222

  • Hero Member
  • *****
  • Posts: 2955
Re: Getting ready for Bonneville(rebuild)
« Reply #2172 on: December 27, 2015, 02:49:52 PM »
 
Every few pages I like to put up videos of our runs so if people want to find them they can locate them a little easier.  These are some of our better videos.

     These are in 2008

http://www.youtube.com/watch?v=mHUEA-pScY8

http://www.youtube.com/watch?v=Udo7XM472Qk

                 2009

http://www.youtube.com/watch?v=55XA0vrNNj0

                 2010

http://www.youtube.com/watch?v=yxkEtJ1b6AI

http://www.youtube.com/watch?v=kLG0JFzazrs

 More from the past

            JL222

  Rob...here's the videos. The 1st one is El Mirage, car hooks up and goes 152 mph in 10.2 sec. Then track turns bad which you can see from other video.

  Another year already :-o

 Another 2 years  :-P Happy New year every body :cheers:
« Last Edit: December 27, 2015, 02:54:24 PM by jl222 »

Offline jl222

  • Hero Member
  • *****
  • Posts: 2955
Re: Getting ready for Bonneville(rebuild)
« Reply #2173 on: January 04, 2016, 04:29:53 PM »
JL222 the fun never ends. BTW How is Arly's liner coming along?


  Arley's liner has been in the body shop for at least 2 yrs  :-o It always amazes me how these guys have no conscience about getting the job done,

 Mostly fuel lines Ect if he ever gets it back.

               JL222

  Arley showed me some pictures of his liner at a New Years Eve party in Santa Barbara. They have a new younger guy in the shop that's been working on it, and its almost done. It really looks nice. :cheers:
  Still a lot of fabrication left, but maybe done by Bville.

        JL222

Offline bvillercr

  • Hero Member
  • *****
  • Posts: 2291
Re: Getting ready for Bonneville(rebuild)
« Reply #2174 on: January 05, 2016, 11:06:26 AM »
What?  No photos?