Thanks guys!
Mats Eriksson who runs ME Racing (pro mod dragracer here in Sweden) has donated 4.5 meter 0.5" chromemoly tubing for the build, thanks a lot!
Tonight I got a bit further with the fuel tank, it was a bit tricky to streamline the front of the tank but I think it will turn out ok in the end. First I tacked the bottom piece in place to have something to relate to.
Rolling the front of the fuel tank.
After that I cut it to shape.
Next up was to weld it to the tank and get the angle right so the radiuses of the tank and the front wheel align.
One more piece in place.
Quite some hammering and bending was required to get the right shape for this piece...
...which fits in the last gap. The piece for the other side of the tank will have to wait since time was running late, as soon as I have gotten some house painting done that I didn´t bother to do last year I will continue on the tank build.
Cheers!
/Anders